Power Generation Capacity:33MW
Commercial Operation Date: December 2017
Gas Turbine model: 1×LM2500+G4
On December 12, 2017, the 96-hour full-load trial operation of Huadian Xiamen Jimei Distributed Energy Phase I Project, which is also the first gas distributed energy station in Fujian Province, was successfully completed and was officially put into operation. The energy station can realize CCHP and a variety of energy products supply to surrounding enterprises by adopting gas power generation, waste heat utilization and environmental-friendly multi-energy integration technology. Compared with traditional energy supply methods, it can reduce energy transmission loss, and deploy energy supply flexibly according to the actual needs of enterprises.