Scale:87MW
Model: HDGE 2xLM2500+G4
Commercial Operation Date: March 2015
Jiujiang project configuration is "2 X 1", which means two gas turbines, one heat recovery steam generator and one steam turbine. With a total capacity of 87MW, the project fully shows graded use of energy, thermal energy in the highest grade used for gas turbine power generation, waste heat in intermediate grade used for steam turbine power generation, heat in low grade supplies industrial steam, and the lowest supplies domestic hot water and refrigeration. Cooling, heating and power are balanced throughout the year, fully realized CCHP, and the energy conversion efficiency is up to 78.68%.