Power Generation Capacity:120MW(Phase I)
Commercial Operation Date:May 2018
Gas Turbine model:2×LM6000PFS
Adopting gas CCHP technology, the project constructed two sets of 60MW gas-steam combined cycle units, gas turbine generator units of which were supplied by HDGE.
The energy station provides cooling, heating and power for 23 enterprises and over 1 million residents in the industrial park, with an annual power generation of 550 million KWh, a heating area of 2 million ㎡, and a comprehensive thermal efficiency of 70.6%.